Send Message
Home ProductsFiber Filling Machine

ESF005-2R 3.0kw Goose Feather Filling Machine Grey Color

Certification
China Shenzhen Xinqunli Machinery Co., Ltd. certification
China Shenzhen Xinqunli Machinery Co., Ltd. certification
Customer Reviews
The quality of this company's products is exceptionally good.

—— David Serano

I'm Online Chat Now

ESF005-2R 3.0kw Goose Feather Filling Machine Grey Color

ESF005-2R  3.0kw Goose Feather Filling Machine Grey Color
ESF005-2R  3.0kw Goose Feather Filling Machine Grey Color

Large Image :  ESF005-2R 3.0kw Goose Feather Filling Machine Grey Color

Product Details:
Place of Origin: SHENZHEN
Brand Name: XQL
Certification: CE
Model Number: ESF005-2R
Payment & Shipping Terms:
Minimum Order Quantity: 1pc
Price: To be negotiable
Packaging Details: Plywood cases
Delivery Time: To be negotiable
Payment Terms: T/T
Detailed Product Description
Material: Steel Price: 1000USD
Weight: 90KG Shipping: Sea
Motor: Global Brand Voltage: 380V
High Light:

ESF005-3

,

ESF005-3

,

3.0kw Goose Feather Filling Machine

ESF005-2R 3.0kw Goose Feather Filling Machine Grey Color
 
Feature:
Description: Feather filling machine
 
Model ESF005-2R
Capacity 100-120kg/h
Power 3.0kw
Air pressure 0.4Mpa
Dimension 800*1000*1100
Weight 90kg
 
Briefing:
The machine used for sofa feather filling.
 
1. Make sure the equipment is in the appropriate position according to the product line collocation.
 
2. Rectify the adjustable foot screw of the machine to raise the equipment in an aclinic and tie up the screwcap; use an inflated bolt too fast when necessary.
 
C Inspect every pipe connection is ok, and make sure there is no cotton or air leak.
D Inspect 3 zigzag turnplates and ducts-feeding cylinder are well-installed, screw whether become flexible.
E Connect the Carding machine and Mixing Container electric control box into 380V power respectively. Note the direction of the motor the same with the mark of the arrowhead on the machine, otherwise, the machine will wall up by the cotton and caused cease.
F Connect the power supply of the Cushion filling machine into the electric control box of the Mixing Container.
G Open the electronic box, push the air pressure button, close the electronic box's door.
H Be sure the machine is kept in good connection with the ground.
 
IV USAGE
( Note the direction of motor the same with the mark of the arrowhead on the machine)
a Push the green knob switch on the power supply box, the motor begins to run, and air pressure produced the machine( Note the direction of motor the same with the mark of the arrowhead on the machine)
b Fiber feeding: put the fiber on the conveyer belt averagely. Do not put it too thick to prevent the jam in the roller. (If used with ESF005-2R, there is no necessary to fill by hand)
c Filling: Take the pillow or sofa cover into the filling exit, press the foot valve by foot and belt feeding will begin, then the fiber will be filled into pillow or sofa cushion.
f After the fiber filling into pillow or cushion is a full stop of the foot valve
V MAINTENANCE
 
Clean the fiber between the rollers and exit and the valve of the filling machine.
Adding the lubricant to the pneumatic component of oil and misteach week.
Do not keep fiber accumulated in the fan of the motor bottom. Keep it tidy
Keep the machine and working environment clean and dry.
 
 
GUIDELINE ON SAFETY MATTERS
It is dangerous to put hands into the ducts-feeding cylinder when ducts feeding
b When operating, don't open the cover of the machine and never put your hands, heads, or any part of the body into the inside of the machine, such as the ducts-feeding cylinder schematic diagram.
C If any abnormity presses the urgent knob on the power supply or the urgent knob on the machine's right.
After completing the work, please cut off the power supply and the air supply.
Guideline on production:
When ducts feeding, feed it evenly, adhere to the principle of fewer ones, more feeding times.
B If necessary card the materials again.
C The foams are limited within the above-mentioned materials.
D Please make sure no rest ducts within the valve and the shell left in the machine before cut off the power
E If ducts jam into the machine, please stop and tidy the machine.
F If overloading makes it stop, please wait a minute. When the overloading protector repositions or reposition the protector by hand and restart.

Contact Details
Shenzhen Xinqunli Machinery Co., Ltd.

Contact Person: Gordon

Tel: +86 18038178075

Send your inquiry directly to us (0 / 3000)